Local

Drivers On McIntire Road Cope With Gas Line Installation

Drivers On McIntire Road Cope With Gas Line Installation

If your daily routine includes McIntire Road, get ready for some slowdowns. A gas line has been installed across a part of McIntire near the 250 Bypass. A contractor is working with 6 inch and 12 inch gas lines. The target date for wrapping up this phase of the project is Wedmesday. Angela Tucker (pictured) is among the engineers who’s involved with the project.